Projects

Adaptation and mitigation strategies: supporting European climate policy case study

March 22, 2006 to June 20, 2009
| Completed Project

The objectives of this project include 1. To develop portfolios of policy options that could provide the basis of a post-2012 climate governance architecture 2.

Doon school TERI-GRIHA and consultancy

March 20, 2006 to September 11, 2011
| Completed Project

Doon school (Dehradun) wants their campus to be a model for green concepts. Art complex and Master's residence of the school will be rated for TERI-GRIHA and guidelines for future new buildings and existing heritage buildings will be framed based on the analysis carried out for Art complex and Master's residence.

GIDB Sponsored- Modifications to the Gujarat Water Regulatory Bill

March 14, 2006 to November 17, 2006
| Completed Project

Gujarat Water Regulatory Commission Bill 2006 is been re-drafted by TERI for Gujarat Infrastructure Development Board (GIDB). The earlier bill, prepared and submitted by TERI was discussed and the recommendations of the high- powered committee of the Gujarat Government, and other comments are being now incorporated in the new Gujarat Water Regulatory Commission Bill 2006.

Energy audit for Raj Bhavan, Kolkata

March 9, 2006 to August 27, 2006
| Completed Project

The objective is this project was to conduct an energy audit for Raj Bhavan building, Kolkata.

Energy for the future: making development sustainable

March 6, 2006 to May 1, 2006
| Completed Project

To prepare the India report to teh 14th session on CSD that focusses on energy for sustainabel development, industrial development and air pollution/climate change. To provide inputs to the CSD documents to the Ministry prior to CSD.

Air-quality monitoring and emission source apportionment study for Bangalore

March 1, 2006 to June 15, 2011
| Completed Project

TERI has initiated a study on source apportionment of particulate matter in the city of Bangalore. The objectives of the study are as follows.

Safeguarding of oil pipelines by controlling microbial induced corrosion through biotechnological approach

March 1, 2006 to June 8, 2011
| Completed Project

One of the major economical loss faced by the oil corporate are due to the corrosion in the pipelines. The internal corrosion of the pipelines is basically caused by MIC (microbial induced corrosion), negatively impacts the integrity, safety, and reliability of oil pipeline operations throughout the world.

Kyoto Mechanism Information Platform

March 1, 2006 to February 28, 2007
| Completed Project

The objective of this project is to collect information and status of CDM activities in India and compile them into short quarterly periodicals (approximately every 3 months, 4 times during the period of one year).

Conference on "India's Energy Securing Strategies: foreign, trade and security policy contexts"

March 1, 2006 to November 30, 2006
| Completed Project

Conference on "India's Energy Securing Strategies: foreign, trade and security policy contexts", being orgnanised by TERI and Konrad Adenauer Foundation on 29-30 September 2006

System Requirements Specifications Study of Energy Management Information System (EMIS) for Kolkata Port Trust

February 25, 2006 to August 24, 2006
| Completed Project

Kolkata is the oldest major port in the country. But the nucleus of the present day Kolkata Port lies much earlier - with the grant of trading rights to the British Settlement in Eastern India by the Moghal Emperor Aurangzeb. The city of Kolkata has a synergistic linkage with the port.