Completed Projects
Execution of 10 kW biomass power generation project in Deodhara Village of Komna Block
September 1, 2003 to
August 31, 2008
The project aims to demonstrate a sustainable model for generation and suppply of electricity using local biomass resources. The village site proposed for the project is one of the remote unelectrified villages of Komna block. The Deodhara village has 6 hamlets, having about 275 households, 2-3 km apart from each other. The project aims to supply electricity to 65 households of Deodhara main village. Initially the project will supply electricity for domestic lighting/street lighting purposes in the evening hours.Investigation, Design, and specification for setting up of Bio-methanation project i.e. suitable waste management system for organic fraction of domestic waste generated
November 12, 2007 to
August 31, 2008
Investigation, Design, and specification for setting up of Bio-methanation project i.e. suitable waste management system for organic fraction of domestic waste generatedNew risks of climate change - building capacity to protect the most vulnerable
June 26, 2007 to
August 31, 2008
the rural poor in developing countries can be made less vulnerable to the adverse impacts of climate change through judicious natural resource management policies and access to risk transfer mechanisms. However, this requires capacity building of policymakers and practitioners not directly dealing with climate change issues. These include finance or agriculture or water ministry officials, insurance regulators, and microfinance institutions.Energy audit at Shree Cement captive power plant
June 1, 2007 to
August 31, 2008
Energy audit of M/s Shree Power (A unit of Shree Cement Limited) will cover boiler and boiler auxiliaries, turbine and turbine auxiliaries and other plant auxiliaries.JBIC Pilot Study for Project Formation for Improvement in Energy Efficiency of Power Sector in India
February 26, 2008 to
August 31, 2008
The objective of the study is to propose and formulate the future candidate projects regarding improvement in energy efficiency of India to be supported by Japanese ODA Loan, based upon the review of the needs of improvement in energy efficiency in India.Demonstration of Biomass based dryer for Agarbathi (incense) sticks
December 1, 2007 to
August 30, 2008
Cycle brand agarbathi is a premium brand with 15% of market share in Indian agarbathi industry, is a product of N Rangarao and Sons (NRS). They have manufacturing centres in Karnataka, Tamil Nadu and Andhra Pradesh and out side India as well. They produce agarbathi & mix perfumes in there own unit. They also have R&D centre with professionally qualified people to innovate new types of products. The company has facility more than 5,00,000 sft of floor space and producing more than 4 billion sticks a year. They are producing 500 different ranges of fragrances.India Study on Energy efficiency in Buildings
June 19, 2008 to
August 27, 2008
The study gives an overview of the the policies, environment, barriers, know how and dissimination initiatives, barriers, projections/ business implications and recommendations for achieving energy efficieny in buildings for India.Disposal of Black liquor wastewater through high rate transpiration system using selected species of plants and mycorrhiza
May 15, 2006 to
July 31, 2008
· To develop intensive green cover in order to achieve higher transpiration rate.· Use of efficient microorganisms for sustainable plant growth and nutrient mobilization and their availability to plants.
· Assessment on loading of effluent (primary treated) in created furrows at site.
· Demonstration of fully operational model with effluent management and greening.