Preparation of detailed project report of a 5 MW solar photovoltaic grid connected power project at Anantpur, AP

01 Mar 2010 26 Sep 2010
Preparing the DPR as per the guidelines of state nodel agence of AP which should be acceptable to Ministry of New and Renewable Energy