Due diligence of wind power project in Maharashtra

18 Feb 2011 24 Sep 2012
Due diligence activity involves the independent assessment of the energy generation estimation from the 25 MW wind power project in a proposed site using WAsP. The input data of site wind conditions, contour, roughness, wind turbine locations and the wind turbine characteristics have been used for annual energy generation estimation from wind farm. The uncertainty analysis had been carried out to estimate the energy generation at confidence intervals of P50, P75, P90 and P95.