Projects

Stabilization and upgradation of biomass derived bio-oils over tailored multifunctional catalysts in a dual stage catalytic process to produce liquid hydrocarbon fuels and Its application studies

September 11, 2013
| Ongoing project

The high oxygen content, acidity and immiscibility with petroleum fuels hinders large-scale applicability of bio-oil obtained via pyrolysis of biomass. This project proposes to develop a technology for Catalytic Two-Stage Stabilization and Upgradation of Bio-oil for enhanced stability and potential applications as fuels.

GRIHA Consultancy services for 5-star GRIHA rating for the proposed World HQ building at Gurgaon

January 23, 2012
| Ongoing project

The project is an upcoming World HQ building in Gurgaon and will involve different resource optimisation techniques with an aim to achieve 5-star GRIHA rating. The resource optimisation involves optimisation of energy and water consumption of the building.

Consultancy of the Royal Norwegian Embassy, Shantipath, New Delhi

April 30, 2011
| Ongoing project
| Buildings

The Norwegian Embassy is adding a residential and chancery block on the existing campus and wants to get GRIHA rating. The objective is to design and energy optimization for compliance with GRIHA rating of the new blocks in the campus.

GRIHA Consultancy for CPCB Bhopal Zonal Office Building

April 8, 2011
| Ongoing project

Central Pollution Control Board (CPCB) is coming up with a new Zonal Office building at Bhopal with a builtup area of around 17000 sqft. CPCB management envisages the proposed project to be a GRIHA rated project and intends to achieve the best standards in green building design and thus to achieve it TERI has been to render GRIHA consultancy and Facilitation services.

Green Building Consultancy and facilitation for GRIHA Certification, ONGC Chennai

February 8, 2011
| Ongoing project

The project objective includes providing green building consultancy and facilitation services for the upcoming buildings of ONGC in Chennai.The project comprises of an office building, recreation block, apartments (G+18), transit buildings and regional store.

Boosting farmers’ income and reducing carbon footprint through solar technology application and cultivation of Medicinal and Aromatic Plants (MAPs) in agricultural practices in Tehsil Bakshi Ka Talab, District Lucknow, Uttar Pradesh

May 2, 2024 to May 30, 2025
| Completed Project
| Sustainable Agriculture | Resources & Sustainable Development | Skill Development & Awareness Programmes

Agriculture sector plays a vital role in the Indian economy, employing nearly half of the country's workforce and contributing significantly to GDP growth. It not only provides food security but also supports various allied industries, such as textiles, food processing, and agrochemicals.

Development of a Hydropower Forecasting System Framework and Implementation of a Pilot Project for Hydropower Optimization in Bhutan

January 2, 2024 to December 30, 2025
| Completed Project
| Climate Change

The consultancy contract on the Project “Development of a Hydropower Forecasting System Framework and Implementation of a Pilot Project for Hydropower Optimization in Bhutan” between USAID-SAREP and TERI to support the Druk Green Power Corporation (DGPC) Limted, Bhutan was started in January, 2024.

Develop an Emergency Action Plan (EAP) for RSD Project and Shahpurkandi Dam Project and Design Flood Review of Ranjit Sagar Dam Project

November 3, 2023 to September 29, 2024
| Completed Project
| Climate Change

The primary objective of the project is to develop an Emergency Action Plan (EAP) for the Ranjit Sagar Dam (RSD) and Shahpurkandi Dam (SPKD) in accordance with the latest guidelines issued by the Central Water Commission (CWC), New Delhi.

Environmental Status Reports for the Urban Local Bodies (ULBs)

August 3, 2023 to September 30, 2023
| Completed Project
| Resources & Sustainable Development | Water | Land | Waste | Air

TERI Mumbai is preparing an Environmental Status Report (ESR) for the Navi Mumbai Municipal Corporation (NMMC).

Regulation Resource Repository for Solar Energy

May 24, 2023 to May 31, 2024
| Completed Project
| TERI Knowledge Resource Centre | Knowledge Repositories & Information Centre

The Regulation Resource Repository for Solar Energy serves as a comprehensive data repository for all regulations in ISA member countries relating to solar energy.