April 1, 1996 to
June 30, 1999
@ Design and fabricate MCFC stack components,
namely electrodes, electrolyte matrix, and bipolar
separator plates with internal gas manifolding
@ Assemble the stack with the above components and
incorporate a control systems for gas flow, temperature, and
power output
@ Test the stack performance.
March 1, 1997 to
February 28, 1998
October 15, 1996 to
September 30, 1997
The objective of the study was to provide Sesa Goa with background information to plan social investment programmes for six mining villages surrounding Sesa Goa’s Sonshi and Codli mines. Among the six villages, four were in North Goa and two in South Goa.
December 1, 1993 to
November 30, 1996
Given the spectrum of benefits that can be derived from mycorrhiza, a Center for Mycorrhizal Culture Collection (CMCC) was established at TERI to both conserve and derive benefits from mycorrhizal diversity in 1993.The depository houses and maintains cultures from 12 different agro-ecological zones out of a total of 20 identified for the country, with 450 isolates of mycorrhizal fungi that foster growth in India''s mycorrizha research sector, by providing starter cultures to laboratories.
September 1, 1989 to
February 29, 1992
June 1, 1989 to
May 31, 1991
May 30, 2007 to
January 1, 1970
The study aims at providing consultancy for connecting additional washing units to the existing 30 MLD (million litres per day) combined effluent treatment plant at Bithuja. The scope of work includes:
preparation of feasibility report,
preparation of tender documents for pumping station and wastewater conveyance system,
evaluation of tenders and selection of contractors for pumping station and wastewater conveyance system,
approval of drawings submitted by the contractor,
supervision during the construction (as and when required).
July 25, 2007 to
January 1, 1970
The project is intended to implement CDM capacity building programme in India under the Clean Development Programme of IGES for CDM in selected Asian Countries. The project comprises of three main components with the different sub-components listed below: 1. Identifying promising CDM project activities and CDM developers 2. Conducting cosultation meetings with project developers 3. Assisting development of PDD for realization of CDM projects.
August 1, 2008 to
January 1, 1970
This project, phase-2 of the study (FY 2008-09), would build on the results of the Phase-1. The study is expected to deepen the understanding of energy conservation opportunities in some of the sectors covered in Phase-1 as well as initiate research in some of the important industrial sectors not covered during Phase-1 of the study. The outcome of Phase-2 study would be useful in formulating long-term future collaborative projects between the two countries (India and Japan) in the field of energy conservation.