Energy audit at ACC Limited, Jamul

17 Nov 2008 31 Dec 2009
ACC Ltd., (Jamul Cement Works) is producing PPC with an installed capacity of 1.58 million tonnes per annum. The plant is also having a CPP of 25 MW capacity. In the proposed energy audit study, the plant equipment/system such as kiln system, raw mill, coal mill circuits, boilers and turbo-generators, fans and blowers, pumps, air compressors, cooling towers and cooling water systems, and electrical systems (demand side management and transformers) have to be covered for conserving energy.