Recommissioning of 10 kW stand-alone wind electric generator (SAWEG) in Leh and Ladakh
01 Aug 1987
24 Nov 1999
@ Carry out recommissioning of a 10 kW SAWEG installed by TERI in 1989
@ Install a state-of-the-art inverter, a new voltage control system, and maintenance-free batteries
@ Meet power requirements for lighting and other low-power appliances
@ Train army personnel in the operation and routine maintenance of the system