DROP Integrated Watershed Development Project
November 2, 2005 to
June 30, 2009
This integrated watershed development project is proposed to be implemented in Joshu- Bhakru village of Semaltagad Micro-Watershed in Dehradun, Uttaranchal. The project aims to transform the target community into a model village as a replicable example of sustainable rural development. It will ensure long term availability of water resources for the rural community through interventions aimed at a catchment level rainwater harvesting and rejuvenation of traditional water harvesting systems.Mainstreaming of thermal gasifier systems
January 1, 2005 to
June 30, 2009
The objective is to promote thermal gasifier technology in select clusters of namkeen- and koya-making industries and customizing the product to suit the selected application. The activities will be sustained by the selection of suitable LSPs (local service providers). With due capacity-building, the manufacturer and LSP would able to promote the market and take care of operation and maintenance. Further, strategic plan for replication of systems in the intervened sectors and establishment of QA and QC (Quality Assurance and Quality Control) measures will be done.Energy audit of equipments at Morarjee Textiles Ltd, Nagpur
December 16, 2008 to
June 30, 2009
To carry out detailed energy audit of utility equipments installed at Morarjee Textiles Ltd, Nagpur covering different areasCompetence network for small and micro enterprises - glass
January 1, 2005 to
June 30, 2009
This component deals with activities in the glass sector and is part of the TERI-SDC partnership programme Competence Network for Small and Micro Enterprises. The overall objective of the programme is increased adoption of resource-efficient technologies amongst targeted end-users, with special focus on small and micro enterprises.Energy audit study of 6th unit (1 x 110 MW) of The Durgapur Projects Ltd
November 1, 2008 to
June 30, 2009
To carry out a comprehensive energy audit study of the Durgapur Projects Limited with the following specific objectives: 1/ To carry out a detailed performance evaluation of major equipments and auxiliaries in the power plant with a view to identify thrust areas for energy conservation. 2/ To quantify the extent of energy savings/performance improvement that can be achieved. 3/ To recommend various technically sound and economically viable measures to improve the end-use energy efficiency.Clean cookstoves check black carbon
September 1, 2009 to
June 29, 2009
The objectives of the project are:- To introduce cleaner-cooking technologies and enable its wider access;
- To gather data on climate change and health outcomes;
- To use the data to scale up and expand the project.
Study of Energy Conservation Option in Spencer Retail Stores (Phase I)
<br>
December 10, 2007 to
June 27, 2009
The study covers the evaluation of refrigeration & air conditioning and lighting systems of the retail stores. The results of the study would be useful to identify energy saving opportunities and would also help to target the areas for a detailed energy audit.Third party independent groundwater resources assessment of Pepsico India Holdings operations in Palakkad, Kerala
January 11, 2008 to
June 24, 2009
The general objective of the project was to undertake an independent assessment on whether the utilization of groundwater by M/s PepsiCo India Holdings Pvt. Ltd, is affecting the water sources of the people of Pudussery Panchayat. The study had the following three specific objectives:(a) whether groundwater extraction by M/s PepsiCo India Holdings Ltd. is depleting the water resources of the Pudussery Panchayat;
(b) whether there is a deterioration in the quality of groundwater due to PepsiCo¿s operations; and