Completed Projects
Pre-Summit Side Event Climate Change, Glacier Melting, and Water Induced Disasters in the Himalayan Region: The Case of Riverine Floods 4 February 2009
February 4, 2009 to
April 30, 2009
Delhi Sustainable Development Summit (DSDS) 2009Pre-Summit Side Event
Climate Change, Glacier Melting, and Water Induced Disasters in the Himalayan Region: The Case of Riverine Floods
TERRAQUIZ - Environment Quiz show for school children
February 12, 2009 to
April 30, 2009
TERRAQUIZ is a 13-episode programme on the environment which is produced by TERI''s Film and Television Unit. It isthe longest and was the first quiz programme based on the environment to be aired on Indian Television channels.
to National Geographical Channel.
Improved implementation of municipal solid waste management
May 1, 2008 to
April 30, 2009
To support MoEF and the Bank in identifying and preparing of a component on Municipal Waste Management (MSW) (disposal and remediation) systems up-gradation which is consistent with the area-based approach and capacity building objectives of the Project.TERI ITEC course - "Mainstreaming Sustainable Development"
July 1, 2008 to
April 30, 2009
The course highlights the importance of an environmentally sensitive development framework for a sustained growth process. Professionals holding at least a Bachelor?s degree, and involved with researching, analyzing and/ or implementing development policy, are encouraged to apply. The course has been designed to be interactive and case-study centric; its practical component will include a study trip to Goa to examine issues associated with tourism, mining and coastal development.Design, field-test and fine-tune of electronic based RE products for selected innovative, on and off-grid and rural applications.
September 24, 2007 to
April 30, 2009
The primary objective of this task would be to concentrate on product development and customization for innovative Renewable Energy applications Task I: Establishment of fully operational laboratory for designing, developing, fine-tuning and testing activities for various electronic control interfaces Task-II: Design, develop and fine-tune of customized RE based productAssessment of exposure and effect on the health of recyclers handling e-waste in National Capital Region, Delhi
<br>
October 1, 2007 to
April 30, 2009
TERI in partnership with Centre of Environmental health CoEH, LNJP hospital New Delhi is carrying out assessment of health of workers involved in e waste collection dismantling, breaking and extraction material in NCR Delhi.Assessing impacts of tributyltin (TBT) on multiple coastal uses
March 1, 2005 to
April 30, 2009
Antifouling paints are applied on the hulls of the ships and boats to control the growth of foulant organisms and to reduce their deleterious effects such as the slowing of the ship speed,the increasing of fuel consumption, the increasing of maintenance costs, etc. TBT paints replaced copper-based paints due to a superior performance in terms of efficacy and duration. However, TBT has been described as the most toxic substance ever introduced in marine environment.Consultancy services to Gujarat State Petroleum Corporation Limited for setting up of 200 MW wind power project in Gujarat
August 26, 2008 to
April 29, 2009
TERI prepared the detailed pre feasibility report for 200 MW wind power project of GSPCL in Gujarat. Prepared tender documents for the same and evaluated the bids recieved from various wind farm developers. Based on the bid evaluation final recommendation is given to GSPC for the implementation of first 50 MW project in the initial stage.