Completed Projects
Adaptation and mitigation strategies: supporting European climate policy case study
March 22, 2006 to
June 20, 2009
The objectives of this project include 1. To develop portfolios of policy options that could provide the basis of a post-2012 climate governance architecture 2. To organise these options, as well as other current and future proposals on the post-2012 climate governance architecture, in an innovative matrix that is structured along the dimensions of climate polity (the overall governance structure), climate policy (actual policies to be negotiated and agreed upon), and climate politics (including negotiation strategies to be pursued by the EU) 3.Facility Water Audit of select unit of Dabur India Limited to identify water conservation measures
June 10, 2008 to
June 20, 2009
1. To develop a water balance of individual process units for one cycle of plant operations 2. To identify the leakage within the water distribution system 3. To develop a water utilisation plan with regard to water use and reuseSetting up of a test project on Village Energy Security at village Jambupani, Distt. Burhanpur of Madhya Pradesh
September 1, 2006 to
June 19, 2009
Setting up of a test project on village energy security at village Jambupani, District Burhanpur, Madhya Pradesh, for electrification of village Jambupani on decentralised basis power generation. The project includes 2 Nos.of 10 kWe capacity biomass gasifier with 100% producer gas engine, biogas plants inclusive of all accessories and civil works and 97 Nos. of TERI model cook stoves.Evaluation of GOAL INDIA''''''''s WATSAN Programme in Schools of Kolkatta and neighbouring districts in West Bengal
December 8, 2008 to
June 17, 2009
The project aims at evaluating the programme of GOAL India whereby WATSAN facilities have been provided to 375 schools that are situated in difficult circumstancse in Kolkatta and neighbouring districts. The main objectives of the study are to : -- Assess the impact of the programme on school enrolment attendance and retention
- Analyse the appropriateness of the school selection criteria
- Evaluate the O&M of the facilities provided under the project
- Provide recommendations for further improvement of the programme
Energy Audit of Piramal Glass Limited, Kosamba, Surat
September 21, 2008 to
June 14, 2009
In the proposed Energy Audit study the plant equipment / system such as Electrical system, Electric drives, Glass melting furnaces, Annealing Lehrs, Compressed air systems, fans and blowers, pumping system and cooling towers, Lighting (Plant and Residential area) has to be covered.Market development for clean energy sector: focus on (MSW) municipal solid waste based energy projects
April 15, 2008 to
June 2, 2009
In order to understand the viability of harnessing MSW-based power generation for enhancing their contribution to the Indian energy sector, it is important to understand the state-of-the-art technologies available across the globe along with all its auxiliary systems and components. The study would therefore focus on assessing the technological status available both internationally and in the country. An assessment of appropriateness of these technologies in the Indian context would be also conducted.Emerging Markets and linkages with Sustainability, Security of Natural Resource ? the case of Copper
April 1, 2008 to
May 31, 2009
Emerging Markets and linkages with Sustainability, Security of Natural Resource ? the case of CopperDistrict wise assessment of common bird population in Delhi
April 1, 2008 to
May 3, 2009
As increasing proportions of the World’s population, production and consumption become concentrated in urban areas, the need for urban development patterns that are more ecologically sustainable becomes obvious. Due to fast urbanization, natural ecosystems are increasingly replaced by urban development. Urbanization increases the distance between people and natural space (Li et al, 2005). However, the key to sustainable development is an accurate estimate of the linkages between human activities and the natural ecosystem, as well as an early detection of a natural disturbance.Pre-Summit Side Event Climate Change, Glacier Melting, and Water Induced Disasters in the Himalayan Region: The Case of Riverine Floods 4 February 2009
February 4, 2009 to
April 30, 2009
Delhi Sustainable Development Summit (DSDS) 2009Pre-Summit Side Event
Climate Change, Glacier Melting, and Water Induced Disasters in the Himalayan Region: The Case of Riverine Floods
TERRAQUIZ - Environment Quiz show for school children
February 12, 2009 to
April 30, 2009
TERRAQUIZ is a 13-episode programme on the environment which is produced by TERI''s Film and Television Unit. It isthe longest and was the first quiz programme based on the environment to be aired on Indian Television channels.
to National Geographical Channel.