Completed Projects
International Climate Champions
December 3, 2008 to
June 30, 2009
Collaborative Indian Climate Champions programme jointly managed and implemented by TERI and the British Council Division, British High Commission across India and SrilankaPreparation of Project Design Document and Project Information Note for 4.5MW Hydro Power Project of Gokak Textiles Ltd under CDM
July 1, 2008 to
June 30, 2009
Objective of the project is to develop Project Design Document and Project Information Note for 4.5 MW Hydro Power Project near Belgaum, Karnataka, being undertaken by M/s Gokak Textiles Ltd. The power generated from the project would be used in the textile plant.IGES CDM Capacity building in India for FY2008: Identification and development of CDM projects
June 23, 2008 to
June 30, 2009
The project is intended to - Formulate project design document (PDD) for realisation of CDM project activity. - Identify promising projects for CDM through the conduct of workshops and consultation meetings. - Assist negotiation process for purchase of certified emission reduction (CER) by the Government of Japan.DROP Integrated Watershed Development Project
November 2, 2005 to
June 30, 2009
This integrated watershed development project is proposed to be implemented in Joshu- Bhakru village of Semaltagad Micro-Watershed in Dehradun, Uttaranchal. The project aims to transform the target community into a model village as a replicable example of sustainable rural development. It will ensure long term availability of water resources for the rural community through interventions aimed at a catchment level rainwater harvesting and rejuvenation of traditional water harvesting systems.Mainstreaming of thermal gasifier systems
January 1, 2005 to
June 30, 2009
The objective is to promote thermal gasifier technology in select clusters of namkeen- and koya-making industries and customizing the product to suit the selected application. The activities will be sustained by the selection of suitable LSPs (local service providers). With due capacity-building, the manufacturer and LSP would able to promote the market and take care of operation and maintenance. Further, strategic plan for replication of systems in the intervened sectors and establishment of QA and QC (Quality Assurance and Quality Control) measures will be done.Energy audit of equipments at Morarjee Textiles Ltd, Nagpur
December 16, 2008 to
June 30, 2009
To carry out detailed energy audit of utility equipments installed at Morarjee Textiles Ltd, Nagpur covering different areasCompetence network for small and micro enterprises - glass
January 1, 2005 to
June 30, 2009
This component deals with activities in the glass sector and is part of the TERI-SDC partnership programme Competence Network for Small and Micro Enterprises. The overall objective of the programme is increased adoption of resource-efficient technologies amongst targeted end-users, with special focus on small and micro enterprises.Energy audit study of 6th unit (1 x 110 MW) of The Durgapur Projects Ltd
November 1, 2008 to
June 30, 2009
To carry out a comprehensive energy audit study of the Durgapur Projects Limited with the following specific objectives: 1/ To carry out a detailed performance evaluation of major equipments and auxiliaries in the power plant with a view to identify thrust areas for energy conservation. 2/ To quantify the extent of energy savings/performance improvement that can be achieved. 3/ To recommend various technically sound and economically viable measures to improve the end-use energy efficiency.Clean cookstoves check black carbon
September 1, 2009 to
June 29, 2009
The objectives of the project are:- To introduce cleaner-cooking technologies and enable its wider access;
- To gather data on climate change and health outcomes;
- To use the data to scale up and expand the project.