May 1, 2008 to
January 31, 2010
The goal of this project is to `motivate and solicit the participation of various stakeholders in municipal waste management? The specific objectives are:
o TEXT
o To share and communicate information to the various stakeholder groups regarding the importance waste reduction and segregation at source TEXT
o To motivate policy makers to adopt and implement an effective waste management policy TEXT
To motivate different stakeholders to participate in waste management through reduction and segregation of waste at source
March 1, 2009 to
January 31, 2010
Comprehensive Energy Audit for best utilization of energy and resource for GMR Hyderabad International Airport Limited
May 15, 2007 to
January 29, 2010
The objective of the project is to provide consultancy on maximizing energy efficiency, water efficiency and various other aspects of green building for the proposed residence of Mr. Arvind Bellad in Hubli, Karnataka.
March 9, 2009 to
January 22, 2010
Conference for school teachers from all over the country and overseas - target number - 300 to 350. Provide a platform to teachers to share knowledge, network and take back knowledge that can be part of their classroom teaching and the environment around them.
Topic: Road to a Sustainable School
October 1, 2008 to
January 10, 2010
To develop a sustainable service delivery model for improvements in rural electricity supply through DG and supply of power using renewables sources of energy
May 1, 2007 to
December 31, 2009
The main aim of the project is to conduct a comprehensive EIA and EMP study of the mining area to identify and analyse the impact of mining on the environment and devise strategies to mitigate the adverse environmental and social impacts.
July 1, 2007 to
December 31, 2009
The Punjab State Electricity Board (PSEB) is operating three thermal power stations, namely Guru Nanak Dev Thermal Plant, Bhatinda (4x110 MW), Guru Hargobind Thermal Power Plant, Lehra Mohabbat (2x210 MW), and Guru Gobind Singh Super Thermal Plant, Ropar (6x210 MW).
July 2, 2007 to
December 31, 2009
The project specific goal is to demonstrate at a site in Karnataka that RBF is a technique capable of economically producing high-quality water from the low-quality local river water. At the same time, we will show to independent small private sector providers (SPSP) that a successful business model can be formed around the design, installation, and operation of RBF systems in Karnataka and the rest of India.
April 1, 2009 to
December 31, 2009
The main objective of the study was to provide a comprehensive approach to calculate the carbon footprint from road works and calculate the reduction of carbon emissions from improved road operations. The study focused on ongoing road projects in South Asian countries, mainly India, Bangladesh, and Sri Lanka.
November 17, 2008 to
December 31, 2009
ACC Ltd., (Jamul Cement Works) is producing PPC with an installed capacity of 1.58 million tonnes per annum. The plant is also having a CPP of 25 MW capacity. In the proposed energy audit study, the plant equipment/system such as kiln system, raw mill, coal mill circuits, boilers and turbo-generators, fans and blowers, pumps, air compressors, cooling towers and cooling water systems, and electrical systems (demand side management and transformers) have to be covered for conserving energy.