Installation of multi-purpose mini-hydro infrastructure (for energy and irrigation) (PPG)

10 Apr 2010 07 Dec 2011
The project objective is to prepare a main project document for the submission and approval from GEF based on feasibility study report including all the requirements of GEF (including socio-economics and technical aspects like design & cost estimate) for small hydro power plant at fall on St. Johns river in Ganta of Liberia.